Citrus Square Senior Community

PROJECT STATUS:

The City Council approved the project entitlement permits on October 25, 2021.  The project plans are currently in the building plan check process.  Construction is expected to begin in the Summer of 2022.  For additional information about the project, please check out the Project Links below.”

PROJECT LINKS:

Final Initial Study/Mitigated Negative Declaration
Citrus Square Public Hearing Notice

The Citrus Square Senior Community draft Initial Study and Mitigated Negative Declaration is available for review and comment. The comment period is August 18, 2021 through September 16, 2021.

Notice of Intent

Initial Study and Mitigated Negative Declaration
Appendix A - Air Quality, Greenhouse Gases, and Energy Analysis Data
Appendix B - Biological Resources Technical Memorandum for Oxford Place
Appendix C - Historic Resources Assessment
Appendix D - Geotechnical Evaluation
Appendix E - Phase 1 Environmental Site Assessment
Appendix F - Preliminary Water Quality Management Plan
Appendix G - Preliminary Hydrology Study
Appendix H - Noise Modeling Results
Appendix I - Public Service and Utility Providers Correspondence
Appendix J - AB 52 Consultation Correspondence

PROJECT LOCATION:
A 6.3-acre site at the northeast corner of Moody Street and Orange Avenue.

APPLICANT:
Chad Brown
Melia Homes
8951 Research Dr. Suite 100
Irvine, CA 92618
chad@melia-homes.com

Citrus Square 2Conceptual Elevations

Citrus SquareConceptual Site Plan

PROJECT DESCRIPTION:
The proposed project includes the construction of 50 affordable condominium units and 48 market-rate condominium units at an approximately 6.3-acre site that is currently used by the Cypress School District for its administrative and maintenance operations. Occupancy of all 98 units would be restricted to households with at least one member 62 years of age or older. The proposed project will include the subdivision and redevelopment of the project site, and will require approval of a tentative tract map, and a Conditional Use Permit for Senior Housing – Affordable by the City of Cypress. As shown in the conceptual site plan, the 48 attached market-rate senior condominium dwelling units are distributed across 8 different buildings (Buildings 1–8) on the western two thirds of the site.  The 50 attached affordable senior condominium dwelling units are distributed across 2 different buildings (Buildings A and B) on the eastern third of the site. Buildings 1–8 would be situated around an internal driveway loop that would connect to Moody Street and Orange Avenue via a private street along the northern and eastern boundaries of the project site. The proposed project would be developed with a gross density of 15.5 dwelling units per acre. In addition to the proposed residential uses, the project would provide open space and community amenities.

REQUESTED ENTITLEMENTS:
Vesting Tentative Tract Map
Mitigated Negative Declaration
Conditional Use Permit

TENTATIVE PROJECT SCHEDULE:

 Task  Approximate Completion Date
 Preparation of the Draft IS/ND  May - August 2021
 Post Draft IS/ND for Public Comment  August - September 2021
 Prepare Final IS/ND  September - October 2021
 Public Hearing  October 2021

 

CITY PROJECT PLANNER
Alicia Velasco, Planning Director
avelasco@cypressca.org